Since the project was executed in November 2020, there has been reduced water shortage problems and Open Defecation (OD) practices in the camp. The facilities have also contributed to mitigating the spread of the COVID-19 in the community.
One automated borehole, four toilets, ten taps and two handwashing facilities were provided at the camp. A hygiene awareness program was conducted to increase knowledge among the IDPs on practices such as handwashing, drinking and cooking with clean water.
The borehole drilling, toilets and other sanitary constructions were conducted in the first three weeks in November 2020. The project was completed on the 26th of November 2020. ACORN Initiative team of five (5) staff and ten (10) volunteers arrived at the IDP camp at 9 am on the 28th of November 2020 for the commissioning and handover of the project.
Project Successes
Links:
By Gloria Bolarinwa | Grants Administrator
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.